NEXT INTAKE FILLING UP · Only a few spots left in our next 6-Week Body Blast CLAIM YOURS →
MEN ONLY · HALESOWEN

Guys 6 Week
Body Blast.

Small group personal training for men over 30 in Halesowen. Get strong, lose the gut, train hard, feel sharp again.

BOOK YOUR FREE CALL →
SPS Fitness male member doing dumbbell overhead press during a training session
REAL TRAINING
SPS Fitness member doing dumbbell bench press in the squat rack area
PROPER STRENGTH WORK
WHAT YOU GET

Train Hard.
Train Smart.

Six weeks of proper coaching designed for men in their 30s, 40s and 50s.

PT-Led Sessions

Designed specifically to shift the gut and drop inches, without spending hours in the gym or eating boring food.

Dedicated Coach

Personal support to give you increased confidence, motivation and accountability, every single week.

Nutrition Support

The basics taught properly. You'll still get that beer at the weekend. No mad diets, no shakes, just better choices.

Proven Plan

Tried and tested on hundreds of locals, delivered by our fantastic coaches who actually care about your results.

Safe Environment

A friendly, supportive gym that's safe to train in, whether you've been training for years or this is your first session.

Small Group · 12 Max

Proper coaching attention. Train alongside other guys at your level. No judgement, no ego, no posing.

Group of men training together at SPS Fitness Halesowen during a small group session
SMALL GROUP. SERIOUS WORK.
HOW IT WORKS

The Guys Body Blast.

A complete 6 week transformation programme built around blokes with busy lives. Here's exactly what's included.

6 Week Programme

A clear start, middle and end. Long enough to see real change, short enough to actually commit to.

2 to 3 Sessions a Week

Flexible booking around your schedule. Train mornings, lunchtimes, evenings or weekends. Built for guys with jobs.

Max 12 Per Session

Small group, properly coached, dedicated PT on the floor. No queueing for kit, no wandering around lost.

Nutrition Coaching

The basics taught properly. No mad diets, no shakes. You'll still get that beer at the weekend.

Weekly Check-Ins

Track progress, adjust the plan, troubleshoot what's not working. We never just leave you to it.

Private Community

A members only group of blokes all on the same journey. Banter, accountability, support when you need it.

REAL PROGRESS TRACKING

See Your Real Progress.
Not Just the Scales.

The scales lie. They go up after a heavy meal, down after a workout, and they don't show fat loss vs muscle gain. So we use professional 3D body scans to track your real transformation.

Every few weeks we'll scan you in our private studio. You'll see exactly where you're losing inches, where your shape is changing, and proof that the work is working, even on the weeks the scales don't move.

  • Full 360° body scan in our private scan room
  • Inches measured at chest, waist, hips, arms and legs
  • Visual proof of change you can see and compare
  • Tracks fat loss separately from muscle gain

"You can fool the scales. You can't fool a body scan."

Example male 3D body scan progress report showing 41 lbs lost and 24.8 inches off torso over 148 days
EXAMPLE PROGRESS REPORT
IS IT RIGHT FOR YOU?

Who Body Blast
Is Built For.

You'll thrive here if:

  • You're a bloke over 30, ready to feel like yourself again
  • You're done making excuses about why you don't train
  • You want a structured plan, not random YouTube workouts
  • You'd rather be coached than figure it out alone
  • You're willing to show up 2-3 times a week for six weeks
  • You want strength and conditioning, not just running on a treadmill

This isn't for you if:

  • You want a 7 day miracle transformation
  • You're not willing to make small lifestyle changes
  • You'd rather lift alone with your headphones in
  • You're looking for the cheapest option in town
  • You're not ready to commit to the full six weeks
BOOK YOUR FREE CALL →

15 minutes. No pressure. No sales pitch.

Member using battle ropes at SPS Fitness Halesowen during a small group training session
FOR BLOKES WHO WANT MORE

Done Making
Excuses?

The dad bod, the office gut, the back that twinges when you bend over. Six weeks to shift it, with coaches who actually care if you turn up.

HOW IT WORKS

Your First Six
Weeks With Us.

Simple. Direct. No nonsense.

Free Call

A 15-minute call so we can hear your goals, your situation, your sticking points. Honest conversation, no sales pitch.

Plan of Action

We build your plan: training schedule, nutrition framework, the small habits that move the needle.

Start Training

Your first week of sessions. Properly coached. You'll find your level fast.

Weekly Check-ins

We track what's working, adjust what isn't, keep you accountable. No one slips through the cracks.

YOUR QUESTIONS

Honest Answers,
No Faff.

I haven't trained in years, will I keep up?+

Yes. Most members haven't trained in years when they start. Every session is scaled to your level. You don't need to be fit to start, you get fit doing the programme. Plenty of blokes have come in after 10+ years out of the gym and made huge progress in six weeks.

Is this just lads grunting in a corner?+

No. Body Blast is small group, max 12 per session, no ego, no posing. Everyone you train with is a normal bloke in their 30s, 40s or 50s, on the same journey. The vibe is supportive, not competitive.

Will I have to give up beer and takeaways?+

No. Sustainable nutrition isn't about cutting out the things you enjoy. We teach the basics so you can make better choices most of the time. You'll still have a beer at the weekend.

How many sessions a week do I need?+

2 to 3 sessions a week is the sweet spot. Enough to see real change, not so much that it takes over your life. Flexible booking across mornings, evenings or weekends, depending on your schedule.

I've got a dodgy back / knees / shoulders. Can I still train?+

Most likely yes. Our coaches are experienced at working around common injuries. Mention it on the call and we'll talk you through how we'd approach it. Lots of our members started with niggles they thought ruled them out.

START TODAY

Ready to Get Sharp
Again?

Book a free no-pressure call. We'll see if Guys Body Blast is the right fit for you.

BOOK YOUR FREE CALL →
TAKES 30 SECONDS · NO SALES PITCH
BOOK FREE CALL